Third Party Inspection
- Product : Any metallic product
- Verification of chemical composition and mechanical properties according to EN 10204, especially in tracibility
Type of documentation for materials for pressure equipmen
- Main pressure-bearing parts in category II, III and IV
-
Specific inspection
- Inspection document type 3.2
-
Appropriate quality management system
- Inspection document type 3.1
- Inspection document type 3.2
-
Main pressure-bearing parts in category I, pressure parts other than main pressure-bearing in categories I to IV, attachments to category II, III and IV parts
-
Non-specific inspection
- Inspection document type 2.2
-
Non-specific inspection
- Inspection document type 2.2
- Inspection document type 2.1
-
Non-specific inspection
-
Other parts
-
Non-specific inspection
- Inspection document type 2.2
- Inspection document type 2.1
-
Non-specific inspection
Procedure of EN 10204 Type 3.2 Inspection
-
- Applicant
- Submission of Pre-inspection document
- Inquiry
- Discussion of inspection criteria, procedure and schedule
- Request for witness
- Application of Test to laboratory
- Preparation of Document to be reviewed
-
- KR
- Discussion of inspection criteria, procedure and schedule
- Quotation (Contract, if required)
- Assignment of inspector
- Witness of sampling
- Witness inspection and document review
- Issue of certificate
- Invoice
1) Pre-inspection document
-
Inspection application(KR form)
- Specification (or Purchase Order)
- Datasheet
- ITP (Inspection & Test Plan)
- Inspection procedure
- General arrangement drawing (approved by project owner, if required)
- Other document required during inspection
2) Document to be reviewed
- Test report which third-party has to review during inspection
- Test result from recognized laboratory
- Calibration certificate for measuring equipment